Some of our projects:
| No. | Contract | Year of Execution | Description of Work | Owner |
|---|---|---|---|---|
| 1. | Ras Lanuf Complex, Libya | 1981 & 1984 |
Electrical installation instrumental works and testing for Ethylene Plant, Utility and Offsite Areas:
|
Oil & Gas Processing Company, Ras Lanuf,Libya |
| 2. | Oil Refining Company, Azzawiya,Libya | 1984 | Turnaround maintenance, refining unit No.1 and No.2 each capacity 60 000 b/crude/day each associated platforming and kerosene hydrocarbon units | Oil refining company, Azzawiya,Libya |
| 3. | LNG Plant Libya | 1984 & 1986 | Reinstrumentation works on:
- boilers, - air compressors, - air compressor local panel, - transmitters, - converters, - thermocouples, - switches. |
Sirte Oil Company (SOC) Marsa El Brega, Libya |
| 4. | Refinery Project Sarir Field, Libya | 1984 & 1986 | All erection and installation works (skid mounted) of a 10 000 BPSD refinery, a 1 000 BPSD catalytic reformer and related facilities;
- civil works (excavation, filling, lean concrete, paving etc.), - cable laying, - installation of lighting system, - installation of equipment, - erection of pumps, motors, furnaces and boilers, - erection of 12 storage tanks for crude oil, gasoline, kerosene, gas, water etc.(incl.floating roofs) capacity 1 000 m3 - 10 000 m3, - insulation and painting works. |
National Oil Corporation, Tripoli, Libya |
| 5. | Ethylene Plant Offsites and Utilities Ras Lanuf Complex, Libya | 1984 & 1993 | -Modification to Process Unit Pipe work
- Modification to Ethylene Unit Pipe work to debottleneck. - Modification within the refinery Unit Furnace. - Modification to existing pipe work to allow for installation of package units. - Ammonia Pumping Package for Distillation Tower and in the Refinery - Diesel Generator Set. - Nitrogen Plant. - Secondment maintenance duties. |
Ras Lanuf oil & gas Processing Co., (RASCAL) Ras Lanuf, Libya |
| 6. | Petrochemical Complex Marsa El Brega Libya Ammonia 1 & 2; Urea 1 & 2; Methanol Plant | 1984 & 1994 | Methanol, ammonia and urea plant annual turnarounds and maintenance works:
-repair works on the cement lined pipes with segregated water cooling system, -dismantling of damaged equipment and erection of new one, -water tanks repair and painting, -insulation works, revamping of turbines. |
National Petrochemical Co., (NAPETCO),H229 Marsa el Brega, Libya |
| 7. | Power and desalination plant EZ-Zuetina-Libya | 1985 & 1986 | Mechanical erection, electrical and instrument installation (3 units 10 000 m3 /day each) | People's community Ajdabya-Libya |
| 8. | Gas turbine Power Plant Marsa El Brega,Libya | 1985 & 1986 | Complete turnkey execution of the erection and commissioning works for: (2 units 18.5 MW each) | Sirte oil company, Marsa el Brega,Libya |
| 9. | Ras Lanuf Complex, Libya Harbor Liquid Loading System | 1985 & 1986 | Electrical installation, instrumental works and erection of telecommunication system, their testing and qualified assistance during start-up. | Ras Lanuf Oil & Gas Processing Company, Libya |
| 10.1 | Petrochemical Plant -Distillation Plant -LNG Plant -Tank Farm Marsa El Brega, Libya | 1990 & 1992 | Term Contract for Maintenance Works for:
- scaffolding, - electrical wiring, - piping works, - steel fabricating, - insulation and refractory, - sandblasting, industrial and domestic painting, - special protective coatings, - sheet metal fabrication, including duct work, - general maintenance type mechanical works. |
Sirte Oil Company (SOC) Marsa el Brega, Libya |
| 10.2 | Oil Fields, Libya
-Zelten -Raguba -Hateiba |
1990 & 1992 | Term Contract for Maintenance Works for:
- scaffolding, - electrical wiring, - piping works, - steel fabricating, - insulation and refractory, - sandblasting, industrial and domestic painting, - special protective coatings, - sheet metal fabrication, including duct work, - general maintenance type mechanical works. |
Sirte Oil Company (SOC) Marsa el Brega, Libya |
| 11. | Central Fuel Distribution System, Marsa El Brega, Libya | 1992 & 1993 | Civil works, installation and commissioning:
- fabrication, installation, testing, painting and commissioning a fuel distribution system, - installation of all cables, cable supports, cable trays and ducts, - insulation works, - testing of wire and cable insulation, - civil works, - cathodic protection, |
Sirte Oil Company (SOC) Marsa El Brega, Libya |
| 12. | Refinery Tank Farm Refurbishment, Marsa El Brega, Libya | 1992 & 1993 | Complete turn-key job incl.supply, installation and commissioning of three tanks and related facilities:
- installation of positive meters, strainers, control valves, pressure and temperature transmitters, - installation of storage tank level and temperature measuring equipment and inventory control system, - civil works, - erection of storage tanks: - 2 No. premium gasoline floating roof storage tanks each 5 000 m3, 1 No.auto diesel oil fixed roof storage tank 5 000 m3, - installation and termination of all electrical power and control cables, cable trays, cable ducts, lighting and other electrical devices, - painting, - commissioning. |
Sirte Oil Company (SOC) Marsa El Brega, Libya |
| 13. | Tobruk Refinery Extension Project, Tobruk, Libya | 1995 & 1996 | Complete erection, insulation and painting of 14 storage tanks including civil works and associated facilities:
- Heavy Naphtha Down Tank 400 m3, - Blending tanks for Motor gasoline and T.E.L. dosage 2 x 5 000 m3, - Product Tanks for one month production storage 2 x 10 000 m3, - Residue tank 24 m3, - Jet fuel tank 4 000 m3, - Crude oil tanks 2 x 10 000 m3, - Storage tanks 3 x 250 m3. |
AGOCO, Libya |
| 14. | Water Supply Project to Cement Factory Souk El KHamis | 1996 & 1997 | Turn-key Project
- civil work - supply of equipment - four well Houses with 75 cub/h deep well - pumping station - water treatment plant - reverse osmosis units. each 50 cubm/h - Automatic multimedia water filters - distribution piping - chemical dosing plant |
Arab Cement Company El Homs Engineering and supply by : BERKEFELD Celle, Germany |
| 15. | Gecol Contract 97/41 | 1998 & 1999 | ERECTION WORKS FOR DESALINATION PLANTS TRIPOLI WEST AND SUSSA POWER STATION Desalination plant 2 x 10,000 cubm/day Sub Contractor to SIDEM for complete erection works, mechanical, piping, electrical, instrumentation, painting and insulation | GECOL |
| 16. | Austroplan Order.56.3.713/62 | 1999 & 2001 | ERECTION WORKS AND START-UP LPG cylinder manufacturing plant at Gharyan, Libya Installation of complete new factory | AUSTROPLAN Austrian Engineering Co. |
| 17. | SOC Contract 92183-210-937 | 2000 | GLRU MODIFICATION PROJECT Supply of material, installation and start-up of the plant | Sirte Oil Company Marsa el Brega |
| 18. | Gecol Contract 97402/MT 0273 | 2000 & 2001 | ERECTION WORKS FOR DESALINATION PLANTS TOBRUK POWER STATION, PHASE III Desalination plant 3 x 13,000 cubm/day Sub Contractor to SIDEM for complete erection works, mechanical, piping, electrical, instrumentation, painting insulation and refractory | GECOL |
| 19. | Gecol Purchase order No. 82599/2 | 2000 & 2003 | GECOL-CONVGAS Benghazi North / Tripoli South power stations Conversation to natural gas, Civil, electrical and mechanical works A turnkey contract for supply and installation for the conversation to natural gas of the Benghazi North and Tripoli South power station of General Electricity Company of Libya (GECOL). The Benghazi North Gas Turbine power plant consists of 3 x 150 MW ABB gas turbines GT13E1. The Tripoli South Gas Turbine power plant consists of 5 x 100 MW ABB gas turbines GT13D3. | GECOL |
| 20. | SOC Contract 92183-210-1090 | 2002 & 2003 | GLRU COMPRESSOR INSTALLATION Supply of electrical and piping material, installation and start-up of the plant | Sirte Oil Company Marsa el Brega |
| 21. | Preheaters Replecement in Cement Factory Souk El Khamis | 2002 & 2003 | Turn-key Project
- supply of material - engineering, fabrication - assembling and installation - painting - installation of bricks & refractory works - heat insulation - commissioning |
Arab Cement Company El Homs |
| 22. | Elevator & Filter Project in Cement Factory Souk El Khamis | 2003 & 2004 | Turn-key Project
-for replacement of old good's & passenger elevator in pre heater section -supply and installation of new gravel filter for water treatment plant with associated equipment |
Arab Cement Company El Homs |
| 23. | Contract MT 0674/001 | 2003 & 2004 | DESALINATION PLANT No. 8 at Azzawiya Oil Refining Co. Complete installation and start up of new skid mounting desalination plant, including civil works | Ayzzawija Oil Refining Co. |
| 24. | SOC Contract 92183-210-1162 | 2004 | STEAM HEADER IN UREA PLANT Modifications to boilers 'A' & 'B', installation and start-up of the plant. | Sirte Oil Company Marsa el Brega |
| 25. | Gecol Contract 775 | 2004 | ERECTION WORKS FOR DESALINATION PLANT ZUARA Desalination plant 3 x 13,000 cubm/day Sub Contractor to SIDEM for complete erection works, mechanical, piping, electrical, instrumentation, painting insulation and refractory. | GECOL |
| 26. | Gecol Contract 2563 | 2004 | EVAPORATOR SKID FRAME BEARING FRAME AT ZUARA Sub Contractor to SIDEM for complete erection works, mechanical, piping, electrical, instrumentation, painting insulation. | GECOL |
| 27. | Gecol Contract 2592 | 2004 | STEEL STRUCTURE FOR WALKWAYS AND PIPE BRIDGE AT ZUARA Sub Contractor to SIDEM for complete erection works, mechanical, welding, piping and painting. | GECOL |
| 28. | Gecol Contract 323 | 2004 | ZUARA SEA WATER INTAKE SYSTEM Sub Contractor to BESIX for complete erection works, mechanical, welding, piping, painting. | GECOL |
| 29. | Gecol Contract LI0021/001,2 | 2006 | ERECTION WORKS FOR DESALINATION PLANT ABUTARABA Desalination plant 3 x 13,000 cubm/day Sub Contractor to SIDEM for complete erection works, mechanical, piping, electrical, instrumentation, painting insulation and refractory. | GECOL |
| 30. | Gecol Contract LI0021/003,4 | 2006 | STEEL STRUCTURE FABRICATION AND ERECTION AT ABUTARABA Sub Contractor to SIDEM for complete erection works, mechanical, welding, piping, painting. | GECOL |
| 31. | Gecol Contract LI0021/005,6 | 2006 | OPTIONAL WORK OF POTABLE WATER LINE - ABUTARABA Sub Contractor to SIDEM | GECOL |
| 32. | Gecol Contract LI0022 | 2006 | OVERHAULING OF THREE BOILERS AT BOMBA Sub Contractor to SIDEM | GECOL |
| 33. | Gecol Contract | 2007 | Refurbishment of Gas Piping System KHOMS POWER PLANT | GECOL |
| 34. | Gecol Contract | 2007 | POTABLE WATER LINE Soussa-Baida-Shahat Sub Contractor to SIDEM | GECOL |
| 35. | MAN Contract | 2008 | ERECTION OF BUFFER TANK TA-004 in Bu Attifel | ENI - AGIP |
| 36. | Gecol Contract | 2008 & 2009 | POTABLE WATER STORAGE TANKS Soussa area Sub Contractor to SIDEM | GECOL |
| 37. | Gecol Contract | 2008 & 2009 | POTABLE WATER STORAGE TANKS Zuara area Sub Contractor to SIDEM | GECOL |
| 38. | Gecol Contract | 2009 | EJECTO COMPRESSOR & BOILER Derna Power and Desalination plant Civil and electromechanical works Sub Contractor to SIDEM | GECOL |
| 39. | Gecol Contract | 2008 & 2009 | PUMPING STATION SOUSSA optional items: boundary wall and travelling crane 10 ton Sub Contractor to SIDEM | GECOL |
| 40. | Gecol Contract | 2009 & 2010 | ERECTION WORKS FOR DESALINATION PLANT AT ZUARA Desalination plant 2 x 40,000 cubm/day Sub Contractor to ENKA | GECOL |
| 41. | GESCO Contract | 2010 | Erection of new marine L.F.O. unloading arm to the light fuel oil tanks KHOMS POWER PLANT | GESCO |
| 42. | ACC Contract No.06 | 2011 & 2012 | For works of installation of Dust Strainers/ Filters for the side Passages, Coolers and cement mills in Souk el Khamis complex for cement and building materials | Arab Cement Company El Homs |
| 43. | FIA Project: PN 1320 | 2012 & 2013 | Construction and erection of North Crude Oil Tank DL located in Sabah, Zuweitina Oil Company, Libya | FERROSTAAL INDUSTRIEANLAGEN GmbH |
| 44. | GDCOL Contract | 2012 | Quarl wall repair for boiler no.3 at Zuara Desalination Plant | GDCOL |
| 45. | ALGEC Contract's | 2012,2013 & 2014 | Overhauling of Gas Turbine Air Intake for units GT 11, GT12, GT13, GT 14 at Gecol Power Plant in Zuweitina, Zawia, Khoms and Benghazi North | GECOL / ALGEC |
| 46. | FIA Project: CN-046-13 | 2013 & 2014 | Reconstruction of Tank 1 at Harouge Ras Lanuf, Libya | FERROSTAAL INDUSTRIEANLAGEN GmbH |
| 47. | ACC Contract 2014 | 2014 | Replacement of Girth Gear & Pinios Cement Mill 2 in Souk el Khamis complex | Arab Cement Company El Homs |
| 48. | SIEMENS GT 800 | 2014 & 2016 | Supply and installation of 5 gas turbines (SGT 800) units 47 MW each Sub Contractor to PIAG AG | GECOL |
| 49. | ALGEC Contract T0114-2014 | 2015 | Supply, Overhauling and Repainting of GT11 Air Intake system at Khoms Power Plant,GT11,GT12,GT13 Air Intake system at Benghazi North Power Plant | GECOL / ALGEC |
| 50. | GECOL Contract 1-200-9/15 | 2015 & 2016 | Repair of damaged reinforced concrete sections inside the steam turbine building and renovation of four sea water outlet basins at Khoms Power Plant | GECOL |
| 51. | ALGEC Contract T0020B-2016 | 2016 | Replacement of LFO Tank No.1 and Maintenance of LFO Tank No.2 at Khoms Power Plant | GECOL / ALGEC |
| 52. | ALGEC CONTRACT T0065-2016 | 2016 & 2017 | Repainting works of sea water and Chlorination system at Zawia Power Plant | GECOL / ALGEC |
| 53. | SIDEM CONTRACT TH00032/001 | 2017 | Overhauling of Desalination Plant at Khoms | GECOL / SIDEM |
| 54. | GDCOL CONTRACT | 2017 & 2018 | Rehabilitation of Boiler No.83 at Tobruk Desalination Plant | GDCOL |
| 55. | SIDEM CONTRACT TH00032/004 | 2018 | Overhauling of Desalination Plant at Tripoli West | GECOL / SIDEM |
| 56. | AHLIA CONTRACT 09.04.2018 | 2018 | The renewing of Substations 31.5 kV and 6 kV at Souk el Khamis Cement Complex | AHLIA CEMENT Co. EL KHOMS |
| 57. | GECOL Contract 2018/2 | 2018 | Maintenance of Fuel Tanks No. 21 & 26 Capacity 20.000 m3 at Khoms Power Plant | GECOL |
| 58. | GECOL Contract 1-2-00-36-18 | 2018 | Replacement of separation filter condensate of Gas system (Gas Scrubber)-Project 73 at Khoms Power Plant | GECOL |
| 59. | GECOL Contract 1/2/00/11/19 | 2019 | Repair and installation of air intake system on unit GT-12 at Zawia Power Plant | GECOL |
| 60. | ALGEC Contract 1000000209 | 2019 | Road Crossing for the Fire Fighting pipes at Western Mountain Power Plant | GECOL / ALGEC |
| 61. | MAKEEN Contract 5583-1 & 5585-1 | 2019 & 2020 | Engineering, Procurement, Supply of BOP, Transport, Civil and Electro-Mechanical Erection Works related to Physical Security Works (supply and installation) for SCPP Tripoli West & SCPP Misurata | GECOL / MAKEEN Energy |
| 62. | GDCOL Contract 2019/2 | 2019 & 2020 | Maintenance of three (3) Boilers at Zuara Desalination Plant | GDCOL |
| 63. | ALGEC P.O. ALG-20-1000013 | 2020 | Supply and installation camp facilities in Tripoli South and Khoms Power Stations | GECOL / ALGEC |
| 64. | SIDEM P.O.20000083HD00521/000 | 2021 & 2022 | Civil works and Erection of 2 MED 8000 and Potabilization Plant 8000m3/d units at Rasco Ras Lanuf Plant | RASCO / SIDEM |
| 65. | GECOL Contract No. 30/2022 | 2022 & 2023 | Supply & Installation of (2) Fuel Tanks with a capacity of 4.000 m³ per tank "at the Misurata Gas Power Station | GECOL |
| 66. | ARC Contract No. 05/2022 | 2022 & 2023 | Installation of heaters and Maintenance of tanks at Benghazi Asphalt Plant | ARC Oil refining company, Azzawiya,Libya |
| 67. | AUCC Contract No. 01/2022 | 2023 & 2024 | Engineering, Procurement & Construction Gas pipeline system at Zliten Cement Plant | AUCC (Arab Union Contracting Company) |
| 68. | RASCO Contract No. 5627 | 2024 | Maintenance Project of Concrete Bases and Steel Construction at Seawater Intake at Rasco Ras Lanuf Plant | RASCO |
| 69. | SIEMENS Contract No. 01/2024 | 2024 | Completion of Remaining Works on SGT800 at Zahra Power Plant | GECOL / SIEMENS |
| 70. | SIEMENS Contract No. 02/2024 | 2024 | Supply & Installation of Camp at Sarir Power Plant | GECOL / SIEMENS |
| 71. | SIEMENS Contract No. 03/2024 | 2024 | Dismantling of Existing 4000F Gas Turbine and Generator & Erection and Installation of New 4000F Gas Turbine and Generator at Sarir Power Plant | GECOL / SIEMENS |
| 72. | GECOL Contract No. 03/2012 | 2024 | Overhauling of Boilers at Khoms Power Plant | GECOL / BILFINGER |